The Renon cable railway
Thank you for your request
Informationen zu The Renon cable railway
Bilder der Unterkunft
In September 2007 the cable railway was shut down and was replaced by a modern cable car in 2009. This modernisation contributed to increasing the number of passengers transported per hour from 250 to 550. Besides passengers, the cable car can also be used for the transport of strollers and bicycles.
The Renon cable railway, alike the railway of the Val Venosta valley, and the Mendola funicular are part of the local transport system of Alto Adige.
Thanks to its 4564 metres in length, this cable railway, officially opened on 14 July 1966, was one of the longest passengers' cable railways in the world. In 12 minutes the cable railway climbs up an incline of 950 metres from the city of Bolzano to Soprabolzano on Renon.
Eat & Drink
Culture
-
Castel Mareccio - Schloss Maretsch
Bolzano (Bozen) -
Piazza Walther square
Bolzano (Bozen) -
Castle Haselburg
Bolzano (Bozen) -
The Cornèdo Burg Karneid Castle
Cornedo all'Isarco (Karneid) -
Castle Runkelstein
Bolzano (Bozen) -
The Maria Assunta Cathedral
Bolzano (Bozen) -
Monumento alla Vittoria monument
Bolzano (Bozen)
Hiking
Bike
-
Tour of Bolzano - Meltina - Valas - San Genesio
Bolzano (Bozen)Show details moderate -
Bolzano - Mezzocorona - Cles - The Mendola Pass
Bolzano (Bozen)Show details difficult -
South Tyrolean Cycling Track – Stage A3: From Bressanone/Brixen to Bolzano/Bozen
Bressanone (Brixen)Show details easy -
The South Tyrolean Unterland cycling path
Bolzano (Bozen)Show details easy -
Itinerary of the Flanders Bolzano-Appiano-Lake Caldaro
Bolzano (Bozen)Show details easy -
Soprabolzano - Santa Croce di Latzfóns - Val Sarentino
Renon - RittenShow details difficult -
From Merano to Bolzano
Merano (Meran)Show details easy -
Fun on Renon
Renon - RittenShow details moderate